- This is the "base" scenario in the sense that we are doing it first and the others build off of it
- Uses s21 control total files
- Uses Blueprint Basic logsums
- Uses s21 zoning modifications: major upzoning in all growth geogs
- Has almost all strategies in
- This is the "baseline" scenario in the sense that it doesn't have any pba50 changes and so it also has far lower control totals
- Uses s20 control total files (these are minus the additional units built bc of housing policy in pba50)
- Uses Baseline logsums (somewhat less congestion than others?)
- Uses s20 zoning modifications: these are minimal in that the do typical No Project treatment (UGB, upzoning within) but may also need UGB expansion to fit control totals
- Has no new strategies from PBA50
- This is the higher funding scenario
- Uses s22 control total files
- Uses Blueprint Plus Fix It First logsums (very similar to s21 logsums)
- Uses s22 zoning modifications: same as s21
- Adds/modifies these strategies (working off of s210:
- adds incubator strategy
- increases size of affordable housing fund
- more slr protection
- This is the higher funding scenario plus the New Transbay Crossing
- Uses s23 control total files
- Uses Blueprint Plus Crossing logsums (moderately different from other scenarios)
- Uses s23 zoning modifications: slightly higher upzoning than s21 and s22 at a few new/upgraded stations
- Same strategies as s22
- Builds off of s23
- Includes both error correction and policy modifications