Skip to content

Enhance NewEngine function to include vectorizer parameter for improv… #429

Enhance NewEngine function to include vectorizer parameter for improv…

Enhance NewEngine function to include vectorizer parameter for improv… #429

Triggered via push January 2, 2025 03:19
Status Failure
Total duration 1m 30s
Artifacts

unit-test.yml

on: push
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 1 warning
unit-test (1.20.0, SQLite3, 5, 6.0)
Process completed with exit code 2.
unit-test (1.20.0, MySQL8.0, 4, 6.0)
The job was canceled because "_1_20_0_SQLite3_5_6_0" failed.
unit-test (1.20.0, MySQL8.0, 4, 6.0)
Process completed with exit code 2.
unit-test (1.20.0, MySQL8.0, 5, 6.0)
The job was canceled because "_1_20_0_SQLite3_5_6_0" failed.
unit-test (1.20.0, MySQL8.0, 5, 6.0)
Process completed with exit code 2.
unit-test (1.20.0, MySQL8.0, 6, 6.0)
The job was canceled because "_1_20_0_SQLite3_5_6_0" failed.
unit-test (1.20.0, MySQL8.0, 6, 6.0)
Process completed with exit code 2.
unit-test (1.20.0, SQLite3, 6, 6.0)
The job was canceled because "_1_20_0_SQLite3_5_6_0" failed.
unit-test (1.20.0, SQLite3, 6, 6.0)
The operation was canceled.
unit-test (1.20.0, SQLite3, 4, 6.0)
The job was canceled because "_1_20_0_SQLite3_5_6_0" failed.
unit-test (1.20.0, SQLite3, 4, 6.0)
The operation was canceled.
unit-test (1.20.0, SQLite3, 5, 6.0)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636