Update beam to 2.59 #2005
Triggered via pull request
September 5, 2024 12:01
Status
Failure
Total duration
24m 51s
Artifacts
–
ci.yml
on: pull_request
Matrix: Build and Test
Matrix: Test Legacy Avro
Matrix: Test Coverage
Matrix: Submit Dependencies
Matrix: Integration Test
Matrix: Generate Site
Matrix: Validate Steward Config
Matrix: Publish Artifacts
Annotations
8 errors
Build and Test (ubuntu-latest, 2.13, corretto@21)
Process completed with exit code 1.
|
Build and Test (ubuntu-latest, 2.13, corretto@11)
The job was canceled because "ubuntu-latest_2_13_corr_3" failed.
|
Build and Test (ubuntu-latest, 2.13, corretto@11)
The operation was canceled.
|
Build and Test (ubuntu-latest, 2.13, corretto@17)
The job was canceled because "ubuntu-latest_2_13_corr_3" failed.
|
Build and Test (ubuntu-latest, 2.13, corretto@17)
The operation was canceled.
|
Build and Test (ubuntu-latest, 2.12, corretto@11)
The job was canceled because "ubuntu-latest_2_13_corr_3" failed.
|
Build and Test (ubuntu-latest, 2.12, corretto@11)
The operation was canceled.
|
Test Coverage (ubuntu-latest, 2.13, corretto@11)
Process completed with exit code 1.
|