Avoid opening the file in postgresql_conf #656
ci.yml
on: pull_request
Spec
/
Setup Test Matrix
25s
Matrix: Spec / spec
Matrix: Acceptance / acceptance
Annotations
5 errors
Acceptance / Acceptance tests (Ubuntu-18.04, puppet8-nightly)
Process completed with exit code 1.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The job running on runner GitHub Actions 233 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The operation was canceled.
|