Skip to content

nightly

nightly #1161

Re-run triggered February 20, 2024 04:05
Status Failure
Total duration 3h 0m 38s
Artifacts

nightly.yml

on: schedule
Spec  /  Setup Test Matrix
37s
Spec / Setup Test Matrix
Matrix: Spec / spec
Acceptance  /  Setup Test Matrix
29s
Acceptance / Setup Test Matrix
Matrix: Acceptance / acceptance
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Acceptance / Acceptance tests (Ubuntu-22.04-arm, puppet7-nightly)
Process completed with exit code 1.
Acceptance / Acceptance tests (Ubuntu-22.04-arm, puppet8-nightly)
Process completed with exit code 1.
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The job running on runner GitHub Actions 263 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The operation was canceled.
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The job running on runner GitHub Actions 82 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The operation was canceled.
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The job running on runner GitHub Actions 117 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The operation was canceled.
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The job running on runner GitHub Actions 358 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The operation was canceled.
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The job running on runner GitHub Actions 134 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The operation was canceled.