nightly #1079
nightly.yml
on: schedule
Spec
/
Setup Test Matrix
38s
Matrix: Spec / spec
Matrix: Acceptance / acceptance
Annotations
11 errors
Acceptance / Acceptance tests (RedHat-9, puppet7-nightly)
Process completed with exit code 1.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)