Skip to content

Fix calendar sync failing on months having 1st day as Monday #20

Fix calendar sync failing on months having 1st day as Monday

Fix calendar sync failing on months having 1st day as Monday #20

Workflow file for this run

name: CI - Pull Request
on:
pull_request:
branches: [main]
paths:
- icloudpy/**
- tests/**
- Dockerfile
- pylintrc
- pytest.ini
- requirements-test.txt
- requirements.txt
- run-ci.sh
workflow_dispatch:
jobs:
cache-requirements-install:
runs-on: ubuntu-latest
steps:
- name: Checkout source code
uses: actions/checkout@v3
- name: Set up Python 3.10
uses: actions/setup-python@v4
with:
python-version: "3.10"
- name: Cache pip dependencies
uses: actions/cache@v3
id: cache-dependencies
with:
path: ~/.cache/pip
key: ${{ runner.os }}-pip-${{ hashFiles('requirements*.txt') }}
restore-keys: |
${{ runner.os }}-pip-
- name: Install dependencies
if: steps.cache-dependencies.outputs.cache-hit != 'true'
run: |
pip install -r requirements-test.txt
test:
needs: cache-requirements-install
runs-on: ubuntu-latest
steps:
- name: Checkout source code
uses: actions/checkout@v3
- name: Set up Python 3.10
uses: actions/setup-python@v3
with:
python-version: "3.10"
- name: Restore pip cache dependencies
uses: actions/cache@v3
with:
path: ~/.cache/pip
key: ${{ runner.os }}-pip-${{ hashFiles('requirements*.txt') }}
restore-keys: |
${{ runner.os }}-pip-
- name: Install dependencies
run: |
pip install -r requirements-test.txt
# - name: Setup tmate session
# uses: mxschmitt/action-tmate@v3
- name: Test with pytest
run: |
pytest
- name: Generate Allure Report
uses: simple-elf/allure-report-action@master
if: always()
with:
allure_results: allure-results
allure_history: allure-history
keep_reports: 100
- name: Upload tests artifacts
if: ${{ failure() }}
uses: actions/upload-artifact@v3
with:
name: tests-output
path: allure-history
retention-days: 1
- name: Upload coverage artifacts
uses: actions/upload-artifact@v3
if: ${{ success() }}
with:
name: coverage-output
path: htmlcov
retention-days: 1