Update from JIRA.
Browse files Browse the repository at this point in the history
  • Loading branch information
jeffcarlin committed Aug 26, 2024
1 parent a4ec953 commit 5f91d1b
Show file tree
Hide file tree
Showing 2 changed files with 0 additions and 466 deletions.
207 changes: 0 additions & 207 deletions DMTR-412-plan.tex
Original file line number Diff line number Diff line change
Expand Up @@ -252,40 +252,6 @@ \section{Personnel}
\medskip
\end{minipage}
\\ \hline
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1097}{LVV-T1097}
& {\small Jeff Kantor } & {\small } &
\begin{minipage}[]{6cm}
\smallskip
{\small Ron Lambert (Rubin Observatory), Kian-Tat Lim (Rubin Observatory), Matt
Kollross (NCSA), Tony Johnson (SLAC), Gregg Thayer (SLAC) }
\medskip
\end{minipage}
\\ \hline
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T2338}{LVV-T2338}
& {\small Wil O'Mullane } & {\small } &
\begin{minipage}[]{6cm}
\smallskip
{\small William O Mullane }
\medskip
\end{minipage}
\\ \hline
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1168}{LVV-T1168}
& {\small Jeff Kantor } & {\small } &
\begin{minipage}[]{6cm}
\smallskip
{\small Ron Lambert (LSST), Albert Astudillo (REUNA), Mauricio Rojas
(CTIO/CISS), Raylex, Coriant, Telefonica contractors }
\medskip
\end{minipage}
\\ \hline
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1612}{LVV-T1612}
& {\small Jeff Kantor } & {\small } &
\begin{minipage}[]{6cm}
\smallskip
{\small Ron Lambert (LSST), Greg Thayer (SLAC) }
\medskip
\end{minipage}
\\ \hline
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T189}{LVV-T189}
& {\small Leanne Guy } & {\small } &
\begin{minipage}[]{6cm}
Expand Down Expand Up @@ -677,18 +643,6 @@ \subsection{Summary}
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T148}{LVV-T148}
& 1
\\
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1097}{LVV-T1097}
& 1
\\
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T2338}{LVV-T2338}
& 2
\\
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1168}{LVV-T1168}
& 1
\\
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1612}{LVV-T1612}
& 1
\\
\href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T189}{LVV-T189}
& 1
\\
Expand Down Expand Up @@ -1077,167 +1031,6 @@ \subsubsection{Test Cases in LVV-C275 Test Cycle}
Final comment:\\


Detailed steps :

\paragraph{ LVV-T1097 - Verify Summit Facility Network Implementation }\mbox{}\\

Version \textbf{1}.
Open \href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1097}{\textit{ LVV-T1097 } }
test case in Jira.

Verify that data acquired by a AuxTel DAQ can be transferred to Summit
DWDM and loaded in the EFD without problems.

\textbf{ Preconditions}:\\
\begin{enumerate}
\tightlist
\item
Summit Control Network and Camera Data Backbone installed and
operating properly.
\item
Summit - Base Network installed and operating properly.
\item
EITHER: AuxTel hardware and control systems are functional with
LATISS. AuxTel TCS, AuxTel EFD, AuxTel CCS, AuxTel DAQ are connected
via Control Network on Summit to Rubin Observatory DWDM (with at least
2 x 10 Gbps ethernet port client cards) OR: high-quality DAQ
application-level simulators that match the form, volume, file paths,
compressibility, and cadence of the expected instrument data, running
on end node computers that are the production hardware or equivalent
to it. Scientific validity of the data content is not essential.
\item
AuxTel Archiver/forwarders installed in Summit and operating properly
running on end node computers that are the production hardware or
equivalent to it.
\item
As-built documentation for all of the above is available.
\end{enumerate}

NOTE: This test will be repeated at increasing data volumes as
additional observatory capabilities (e.g. ComCAM, LSSTCam) become
available. ~Final verification will be tested at full operational
volume. After the initial test, the corresponding verification elements
will be flagged as ``Requires Monitoring'' such that those requirements
will be closed out as having been verified but will continue to be
monitored throughout commissioning to ensure they do not drop out of
compliance. ~This will also be monitored for end to end Summit - Data
Facility transfers during Commissioning.

Final comment:\\


Detailed steps :

\paragraph{ LVV-T2338 - Replicated telemetry data agrees with telemetry produced at the summit }\mbox{}\\

Version \textbf{2}.
Open \href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T2338}{\textit{ LVV-T2338 } }
test case in Jira.

Show that telemetry data can be accessed from the replicated EFD.
~Further, show that the values in the replicated database agree with the
values in the summit EFD over a specified time range and set of
topics.\\
\strut \\
This test case provides partial coverage of the requirement
DMS-REQ-0168, Summit Facility Data Communications: "The DMS shall
provide data communications infrastructure to accept science data and
associated metadata read-outs, and \textbf{the collection of ancillary
and engineering data}, for transfer to the base facility.", as adapted
to the current design for EFD replication (see
\href{https://dmtn-082.lsst.io}{DMTN-082}).

\textbf{ Preconditions}:\\
See prerequisites in the Test Plan LVV-P90

Final comment:\\


Detailed steps :

\paragraph{ LVV-T1168 - Verify Summit - Base Network Integration }\mbox{}\\

Version \textbf{1}.
Open \href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1168}{\textit{ LVV-T1168 } }
test case in Jira.

Verify the integration of the summit to base network by demonstrating a
sustained and uninterrupted transfer of data between summit and base
over 1 day period at or exceeding rates specified in \citeds{LDM-142}. Done in 3
phases in collaboration with equipment/installation vendors (see test
procedure).

\textbf{ Preconditions}:\\
PMCS DMTC-7400-2330 COMPLETE\\
By phase:

\begin{enumerate}
\tightlist
\item
Posts from Cerro Pachon to AURA Gatehouse repaired/improved. ~Fiber
installed on posts from Cerro Pachon to AURA Gatehouse. ~Fiber
installed from AURA Gatehouse to AURA compound in La Serena. OTDR
purchased.
\item
AURA DWDM installed in caseta on Cerro Pachon and in existing computer
room in La Serena. ~DTN installed in La Serena. ~DTN loaded with
software and test data staged.
\item
Base Data Center (BDC) ready for installation of LSST DWDM. ~Fiber
connecting existing computer room to BDC. ~LSST DWDM equipment
installed in Summit Computer Room and BDC.
\end{enumerate}

Final comment:\\


Detailed steps :

\paragraph{ LVV-T1612 - Verify Summit - Base Network Integration (System Level) }\mbox{}\\

Version \textbf{1}.
Open \href{https://jira.lsstcorp.org/secure/Tests.jspa#/testCase/LVV-T1612}{\textit{ LVV-T1612 } }
test case in Jira.

Verify ISO Layer 3 full (22 x 10 Gbps ethernet ports on DAQ side with
test data from DAQ test stand, AURA, Camera DAQ team do test).
Demonstrate transfer of data at or exceeding rates specified in \citeds{LDM-142}.

\textbf{ Preconditions}:\\
\begin{enumerate}
\tightlist
\item
PMCS DMTC-7400-2400 COMPLETE
\item
\href{https://jira.lsstcorp.org/secure/Tests.jspa\#/testCase/1401}{LVV-T1168}
Passed
\item
EITHER: Full Camera DAQ installed on summit and loaded with data OR:
high-quality DAQ application-level simulators that match the form,
volume, file paths, compressibility, and cadence of the expected
instrument data, running on end node computers that are the production
hardware or equivalent to it. Scientific validity of the data content
is not essential.
\item
Archiver/forwarders installed at Base running on end node computers
that are the production hardware or equivalent to it.
\item
As-built documentation for all of the above is available.
\end{enumerate}

NOTE: This test will be repeated at increasing data volumes as
additional observatory capabilities (e.g. ComCAM, FullCam) become
available. Final verification will be tested at full operational
volume.After the initial test, the corresponding verification elements
will be flagged as ``Requires Monitoring'' such that those requirements
will be closed out as having been verified but will continue to be
monitored throughout commissioning to ensure they do not drop out of
compliance. This will also be monitored for end to end Summit - Data
Facility transfers during Commissioning.

Final comment:\\


Detailed steps :

\paragraph{ LVV-T189 - Verify implementation of Base Facility Infrastructure }\mbox{}\\
Expand Down
Loading