chore: update dependency loopback-connector-postgresql to ^7.1.6 #16290
Triggered via pull request
November 6, 2024 22:01
Status
Failure
Total duration
1h 8m 10s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 58s
Code Lint
7m 11s
Commit Lint
5m 56s
Verify Docs
6m 15s
Post-Test
0s
Annotations
4 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|
Test (ubuntu-latest, 18)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 20 minutes.
|
Test (ubuntu-latest, 18)
The operation was canceled.
|