Skip to content

chore: update dependency loopback-connector-postgresql to ^7.1.6 #16290

chore: update dependency loopback-connector-postgresql to ^7.1.6

chore: update dependency loopback-connector-postgresql to ^7.1.6 #16290

Triggered via pull request November 6, 2024 22:01
Status Failure
Total duration 1h 8m 10s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: Test
Post-Test
0s
Post-Test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 20 minutes.
Test (macos-latest, 20)
The operation was canceled.
Test (ubuntu-latest, 18)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 20 minutes.
Test (ubuntu-latest, 18)
The operation was canceled.