Skip to content

chore: update dependency http-status to ^1.8.1 #16277

chore: update dependency http-status to ^1.8.1

chore: update dependency http-status to ^1.8.1 #16277

Triggered via push November 6, 2024 21:40
Status Failure
Total duration 6h 0m 23s
Artifacts
Matrix: Test
Post-Test
0s
Post-Test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 20 minutes.
Test (macos-latest, 20)
The operation was canceled.
Verify Docs
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
Verify Docs
The operation was canceled.
Test Benchmark
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
Test Benchmark
The operation was canceled.