Skip to content

Merge pull request #3 from langtech-bsc/geneval-dev #11

Merge pull request #3 from langtech-bsc/geneval-dev

Merge pull request #3 from langtech-bsc/geneval-dev #11

Triggered via push December 2, 2024 14:37
Status Failure
Total duration 45s
Artifacts

unit_tests.yml

on: push
Linters
35s
Linters
External LM Tests
18s
External LM Tests
Matrix: CPU Tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
External LM Tests
Process completed with exit code 1.
CPU Tests (3.8)
Process completed with exit code 1.
CPU Tests (3.9)
The job was canceled because "_3_8" failed.
CPU Tests (3.9)
The operation was canceled.
Linters
Process completed with exit code 1.
CPU Tests (3.11)
The job was canceled because "_3_8" failed.
CPU Tests (3.11)
The operation was canceled.
CPU Tests (3.10)
The job was canceled because "_3_8" failed.
CPU Tests (3.10)
The operation was canceled.