ZXF: [Platform] JRS Daily (Interval: 5) #276
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
platform-zxf-jrs-daily-interval-05.yaml
on: workflow_dispatch
NewNodesSimilarStake
/
Standard
20m 49s
SimilarStake
/
Standard
1h 5m
NewNodesZeroStake
/
Standard
34m 3s
ZeroStake
/
Standard
1h 6m
Annotations
3 errors
NewNodesSimilarStake / Standard
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
NewNodesSimilarStake / Standard
The self-hosted runner: hedera-services-linux-large-v7dsb-lqj7p lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
NewNodesSimilarStake / Standard
The operation was canceled.
|