fix(deps): Update did-vc-libraries to v6 (major) #1569
build-and-test-on-pr.yml
on: pull_request
Annotations
5 errors
test-integration (3)
Process completed with exit code 1.
|
test-integration (1)
The job was canceled because "_3" failed.
|
test-integration (1)
The operation was canceled.
|
test-integration (2)
The job was canceled because "_3" failed.
|
test-integration (2)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
coverage-artifacts
Expired
|
3.06 MB |
|