fix: take into account chart version when determine the apply strategy #465
build-pr.yml
on: pull_request
Annotations
7 errors
e2e-operator / e2e-operator (1.29.8)
Process completed with exit code 2.
|
e2e-operator / e2e-operator (1.27.16)
The job was canceled because "_1_29_8" failed.
|
e2e-operator / e2e-operator (1.27.16)
Process completed with exit code 2.
|
e2e-operator / e2e-operator (1.28.13)
The job was canceled because "_1_29_8" failed.
|
e2e-operator / e2e-operator (1.28.13)
The operation was canceled.
|
e2e-operator / e2e-operator (1.30.4)
The job was canceled because "_1_29_8" failed.
|
e2e-operator / e2e-operator (1.30.4)
The operation was canceled.
|