Skip to content

fix: take into account chart version when determine the apply strategy #465

fix: take into account chart version when determine the apply strategy

fix: take into account chart version when determine the apply strategy #465

Re-run triggered October 2, 2024 17:33
Status Failure
Total duration 19m 33s
Artifacts

build-pr.yml

on: pull_request
Matrix: e2e-olm / e2e-olm
Matrix: e2e-operator / e2e-operator
Fit to window
Zoom out
Zoom in

Annotations

7 errors
e2e-operator / e2e-operator (1.29.8)
Process completed with exit code 2.
e2e-operator / e2e-operator (1.27.16)
The job was canceled because "_1_29_8" failed.
e2e-operator / e2e-operator (1.27.16)
Process completed with exit code 2.
e2e-operator / e2e-operator (1.28.13)
The job was canceled because "_1_29_8" failed.
e2e-operator / e2e-operator (1.28.13)
The operation was canceled.
e2e-operator / e2e-operator (1.30.4)
The job was canceled because "_1_29_8" failed.
e2e-operator / e2e-operator (1.30.4)
The operation was canceled.