Skip to content

[DPE-5591] Rework status handling #1291

[DPE-5591] Rework status handling

[DPE-5591] Rework status handling #1291

Triggered via pull request October 31, 2024 13:26
Status Cancelled
Total duration 54m 40s
Artifacts 2

ci.yaml

on: pull_request
Matrix: Build charms
sync-docs  /  Open PR with docs changes
2m 9s
sync-docs / Open PR with docs changes
Matrix: integration-test
Matrix: integration-test-ha
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
integration-ha
Canceling since a higher priority waiting request for 'Tests-refs/pull/141/merge' exists
integration-ha
The operation was canceled.
sync-docs / Open PR with docs changes
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/

Artifacts

Produced during runtime
Name Size
packed-charm-cache-true-.-base-0
15.8 MB
packed-charm-cache-true-tests-integration-app-charm-base-0
6.73 MB