Skip to content

Tests

Tests #1285

Triggered via schedule October 29, 2024 01:22
Status Failure
Total duration 2h 41m 31s
Artifacts 2

ci.yaml

on: schedule
Matrix: Build charms
sync-docs  /  Open PR with docs changes
3m 3s
sync-docs / Open PR with docs changes
Matrix: integration-test
Matrix: integration-test-ha
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
integration-ha
The job running on runner GitHub Actions 334 has exceeded the maximum execution time of 120 minutes.
integration-ha
The operation was canceled.
sync-docs / Open PR with docs changes
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/

Artifacts

Produced during runtime
Name Size
packed-charm-cache-true-.-base-0
15.8 MB
packed-charm-cache-true-tests-integration-app-charm-base-0
6.73 MB