Skip to content

Rebuild January 2025 - switch to rattler-build #495

Rebuild January 2025 - switch to rattler-build

Rebuild January 2025 - switch to rattler-build #495

Triggered via pull request January 6, 2025 05:23
Status Cancelled
Total duration 13s
Artifacts

testpr.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
build (macos-13, osx-64)
The run was canceled by @Tobias-Fischer.
build (macos-13, osx-64)
A task was canceled.
build (macos-14, osx-arm64)
The run was canceled by @Tobias-Fischer.
build (macos-14, osx-arm64)
A task was canceled.
build (ubuntu-latest, linux-64)
The run was canceled by @Tobias-Fischer.
build (ubuntu-latest, linux-64)
ENOTEMPTY: directory not empty, rmdir '.pixi/envs/beta/lib'
build (ubuntu-latest, linux-64)
The operation was canceled.
build (windows-2019, win-64)
The run was canceled by @Tobias-Fischer.
build (windows-2019, win-64)
A task was canceled.