Skip to content

Latest commit

 

History

History
22 lines (15 loc) · 808 Bytes

infrastructure-release-process.md

File metadata and controls

22 lines (15 loc) · 808 Bytes
title layout categories
Release process
main
infrastructure

This is to document the release process of AliRoot / AliPhysics.

Patching old ( <= AliRoot-v5-08) releases

Around AliRoot-v5-08 / AliRoot-v5-09 transition there was a cleanup of large files, which were removed from the history of the official Github repository and left in a CERN hosted gitlab repository:

https://gitlab.cern.ch/alisw/AliRoot-legacy

For this reason any patch release on top of an old release should be tagged from that repository. In particular you have the following branches:

  • v5-09-18b-01 (SLC5, alidist: legacy/v5-09-18)
  • v5-08-13zm-01-cookdedx (SLC5, alidist: IB/v5-08/prod)
  • v5-08-13q-p14-01-cookdedx (SLC5, alidist: IB/v5-08/prod)
  • v5-08-13q-p14-01 (SLC5, alidist: IB/v5-08/prod)