You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Before 0.6, we need to review and finalize the example presenting the EstimatorReport in the example gallery.
Right now, there are a couple of TODO and some of the features are not presented. We might want to split this bit example into two examples: (i) a data science example and (ii) a more engineer/technical example a bit the insights of this reporter (cache mainly).
split example
one dedicated to data science: the metrics
one dedicated to data science: the plots
another to tech (including cache)
describe data set in example (code line). Answer is available in openML.
I started a TODO list to make this issue to ready. I added your points @sylvaincom. @glemaitre, do you see anything else to add?
MarieS-WiMLDS
changed the title
Follow-up EstimatorReport: need to finalize the example in the sphinx-gallery
docs (EstimatorReport): need to finalize the example in the sphinx-gallery
Jan 21, 2025
Before 0.6, we need to review and finalize the example presenting the
EstimatorReport
in the example gallery.Right now, there are a couple of TODO and some of the features are not presented. We might want to split this bit example into two examples: (i) a data science example and (ii) a more engineer/technical example a bit the insights of this reporter (cache mainly).
The text was updated successfully, but these errors were encountered: