You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
rollapp have active sequencer A, which wants to exit its role
sequencer B
configured using p2p sync
Test Steps
seq A want to exit seq role (unbond)
Start notice_period with default time = 2 mins
Check IBC-Transfer before the switch/after the switch/during the switch
Seq B bonded
Expected Results
sequencer A stopped at block height X on the rollapp.
sequencer B started at block height X+1 on the rollapp.
block height X of the rollapp in the last block in the last batch of sequencer A.
block height x+1 of the rollapp is the first block in the first batch of sequencer B
full nodes are eventually synced
sequencer B status is bonded and A is unbonded.
Live Test
Yes
Comments
No response
The text was updated successfully, but these errors were encountered:
anhductn2001
changed the title
[E2E Test] Sequencer Rotation happy flow with only sequencer coming and syncing over DA
[E2E Test] Sequencer Rotation happy flow with only sequencer coming and syncing over P2P
Aug 16, 2024
Test Case Type
New
DRS
ALL
Target Milestone
3D
Test Case Issue link
No response
Epic
sequencer rotation
Test Case Description
happy flow with only seq coming
Preconditions
Test Steps
Expected Results
Live Test
Comments
No response
The text was updated successfully, but these errors were encountered: