Skip to content

Latest commit

 

History

History
41 lines (21 loc) · 2.43 KB

grid-visualization.md

File metadata and controls

41 lines (21 loc) · 2.43 KB

3D Grid Visualization

Step 1 - Import Eclipse Case

Image

Import grid data by using the "Import Eclipse Case"-button from the folder "grid-visualization"

Step 2 - Visualizing Dynamic Properties

Image

In the Project Tree select Cell Results, then navigate to the Property Editor and select a "Type", in this case Dynamic. Further, find the "PRESSURE" property from the drop-down menu and select it. This will load the property on to your current view.

Step 3 - Animation and Report Steps

Use the Play button in the animation button to get to the last step. Make sure that neither the "Repeat From Start" nor the "Repeat Forwards/Backwards" are checked. You can also select the last time step by using the drop-down menu in the animation part of the quick access bar.

Step 4 - Import formation names

Navigate to File->Import->Import Formation Names and import the formation names from the Norne_ATW2013.lyr file.

Step 5 - Create a new View and Display Formations

Image

Navigate back to the Project Tree and right-click on "NORNE_ATW2013_RFTPLT_V2" and select "New View" as illustrated in the above picture.

Image

In View 2 select Cell Result and then Navigate back to the Property Editor and select a "Type", in this case "Formation Names" and click the "Active Formation Names" option.

(OPTIONAL) Step 6 - Show and link multiple views

With the two views active you could click the "Tile Window" in the Window management buttons to visualize both the Views simultaneously. You can even link the views to show the exact same positions by selecting the right-clicking in both Reservoir View

Image

In additionally, a new menu will appear in the Project Tree that allows you to attach, detach and terminate links.

For more information go to: https://resinsight.org/3d-main-window/linkedviews/